• City of Olean (Completed)

The Project includes replacing an existing 4" waterline with a new 8" waterline on N. Fourth St. from Laurens St. to Sullivan St. and on Washington St. from N. Fourth to N. 10th St. within the City of Olean.  Both streets will be milled and paved after water main installation is complete and new sidewalks and curbs will be installed. 

  • Village of Cattaraugus - Water System Improvements (Completed)

Project involves the installation, testing, disinfection, and restoration of 9,700 linear feet of 6-inch HDPE by Horizontal Direction Drilling (HDD), 2,100 linear feet of 8-inch HDPE by HDD, 7,900 linear feet of 6-inch HDPE by open cut and 2,200 linear feet of 8-inch HDPE waterline by open cut. The project also includes road crossings, water services, blow off hydrant assemblies, interconnections, installation of master meters, installation of a prefabricated equipment enclosure, and abandonment of the existing water system.


  • Village of Mayville - Water System Improvements, Water Main and Storage Tanks (ongoing)

Project involves the installation of approximately 11,800 linear feet of 8-inch ductile iron water service, 1,200 linear feet of HDPE water main, various new water service installations, various water service reconnections, fire hydrants, the demolition of three water storage tanks, and the construction of a new water storage tank.


  • Village of Westfield - Water System Improvements 

Project consisted of approximately of 2,800 linear feet of 8-inch PVC and 6,600 linear feet of 12-inch PVC water main replacement along sections of West Main Street (NYS Route 20) and Bliss Street in the Village of Westfield. The project included several creek and road crossings.


  • Town of Machias - Lime Lake Sewer District, Sanitary Collection System

Project consisted of the installation, testing, and restoration of approximately 160 linear feet of 6-inch HDPE low pressure sewer main, 8,400 linear feet of 4-inch HDPE low pressure sewer main, 9,000 linear feet of 3-inch low pressure sewer main, 8,300 linear feet of 2-inch HDPE low pressure sewer main, 400 linear feet of 4-inch SDR-35 PVC sewer main, two jack and bore installations under the B&P Railroad, an interconnection, valves and valve boxes, air release stations, clean-outs and over 400 sewer services each with a grinder pump units.


  • Cattaraugus County Road 13 - Repair and Realignment

Project was located in the Town of Mansfield, Cattaraugus County, NY. The works area was county Road 13, between the intersection of Hencoop Hollow/Kent Road and Mansfield Bridge No. 54. The roadway reconstruction was approximately 1.3 miles long. The work consisted on regrading the ditches, placement of new drainage pipes and cross culverts. The replacement of Mansfield Bridge No. 58 with a prestressed concrete beam structure was also included in the project.


   • Village of Gowanda - Water Improvements Project

Project included the installation of approximately 55 feet of 6 ductile iron pipe, 1725 linear feet of 8-inch ductile iron pipe, 1795 linear feet of 10-inch ductile iron pipe, gate vales, hydrant assemblies, service connections, interconnections and pressure testing, flushing and disinfection.


  • Town of Leon - Bailey Hill Road Culvert Replacement  

Project included the removal of the existing culvert including concrete block headwalls. Installation of a precast box culvert (18’-0” span x 6’-6” rise) along with precast cutoff walls, headwalls, bed retention sills and wingwalls. Installation of 100 linear feel of replacement roadway pavement and the subsequent required shoulder work.

  • Town of Leon - Eldridge Road Culvert Replacement  

Project included the removal of the existing culvert including the headwalls and guide rail. Installation of a precast box culvert (19’-0” span x 7’-6” rise) along with precast cutoff walls, headwalls, bed retention sills and wingwalls. Installation of 100 linear feel of replacement roadway pavement and the subsequent required shoulder work.


  • Town of Randolph - Main Street Water Line Reconstruction
Project included the installation, testing, disinfections, and restoration of 8-inch PVC waterline along Main Street. Installation, testing, disinfection, and restoration to replace the existing booster pump and PRV. The installation, testing, disinfection, and restoration of the 4-inch HDPE waterline along Larkin Street Booster Station. The installation, testing, disinfection, and restoration of approximately 56 residential water meter pits.

 TO BE UPDATED